PORTFOLIO

Our Work

A selection of projects that demonstrate CEG’s technical depth, multidisciplinary coordination, and commitment to delivering results for public and private clients.

eastern-state-hospital-medical-lake-wa-civil-mep-engineering.jpg

Eastern State Hospital Activity Therapy Building

Medical Lake, WA
CEG delivered a full-scope renovation of a 55,000 SF activity therapy building at Eastern State Hospital, including HVAC, electrical, fire protection, and building automation upgrades across three occupied phases.
eastern-state-hospital-pine-lodge-mv-electrical-feeder-medical-lake-wa.jpg

Eastern State Hospital Pine Lodge Electrical Feeder Replacement

Medical Lake, WA
CEG replaced aging medium-voltage cabling across a multi-loop campus, modernizing the MV system to current code with minimal outages, new sectionalizing cabinets, and full utility coordination.
penitentiary-h-building-condenser-replacement-electrical-mechanical-structural-walla-walla-wa.jpg

Washington State Penitentiary H Building Condenser Replacement

Walla Walla, WA
A full design-build condenser replacement at Washington State Penitentiary, engineered entirely in-house by CEG across mechanical, electrical, and structural disciplines with zero subconsultants.
eastern-state-hospital-commissary-building-repairs-electrical-medical-lake-wa.jpg

Eastern State Hospital Commissary Building Repairs

Medical Lake, WA
Electrical design for Eastern State Hospital’s Commissary Building, including fire alarm integration, switchboard and panelboard replacement, lighting upgrades, fiber optic feed, generator backup, data infrastructure, and access control systems.
lakeland-village-campus-water-main-replacement-civil-medical-lake-wa.jpg

Lakeland Village Campus Water Main Replacement

Medical Lake, WA
Aging water mains, limited as-builts, and an occupied campus, CEG engineered a fast-tracked replacement of 1,300+ linear feet of failing infrastructure at Lakeland Village, protecting the Owner at every phase.
eastern-state-hospital-laundry-waste-line-replacement-electrical-plumbing-medical-lake-wa.jpg

Eastern State Hospital Laundry Waste Line Replacement

Medical Lake, WA
CEG resolved chronic drain backups, replacing waste and vent pipes across four floors and expanding laundry facilities, with plumbing and electrical engineering provided.
station-food-cart-pod-civil-fire-protection-mep-structural-vancouver-wa.jpg

Vancouver Station Food Cart Pod

Vancouver, WA
From bare land to the largest food cart pod in the USA, CEG managed every aspect of Vancouver Station’s development, delivering architecture, engineering, permitting, and construction entirely in-house.
oregon-military-department-moses-lake-readiness-center-electrical-moses-lake-wa.jpg

Oregon Military Department Milton-Freewater Armory

Milton-Freewater, OR
Full HVAC modernization at a National Guard Armory, with CEG leading mechanical, structural, and electrical design, replacing aging systems, upgrading controls, and reinforcing the structure for rooftop equipment.
washington-military-department-moses-lake-readiness-center-electrical-moses-lake-wa.jpg

Washington Military Department Moses Lake Readiness Center

Moses Lake, WA
Moses Lake Readiness Center received a fire alarm upgrade including a new control panel, HVAC and sprinkler integration, device adjustments, and cellular communication, with electrical engineering provided by CEG.
hudsons-bay-high-school-trade-facility-mep-structural-vancouver-wa.jpg

Hudson’s Bay High School Trade Facility

Vancouver, WA
A 7,500 SF skilled trades training facility featuring VRF HVAC, energy recovery ventilation, and advanced LED lighting controls, with structural, mechanical, and electrical engineering delivered by CEG.
yakima-valley-school-campus-generator-replacement-electrical-mechanical-selah-wa.jpg

Yakima Valley School Campus Generator Replacement

Selah, WA
Backup power infrastructure at Yakima Valley School nursing facility was fully upgraded, with CEG replacing three generators, installing eight transfer switches, and coordinating with L&I, DOH, and Clean Air agencies.
chiller-replacement-washington-mechanical-electrical-engineering.jpg

Eastern State Hospital FSU Chiller Replacement

Medical Lake, WA
CEG investigated premature chiller failures at Eastern State Hospital, discovering airflow restrictions caused by solid yard walls, and engineered a lasting solution to restore performance and prevent future equipment failures.
swire-coca-cola-spokane-distribution-center-expansion-electrical-power-system-study-electrical-spokane-wa.jpg

Swire Coca-Cola Power System Study

Spokane, WA
CEG conducted a full power distribution study for Swire Coca-Cola, delivering arc flash labels, fault current analysis, and protective device coordination through comprehensive SKM modeling.
sunmodo-warehouse-storage-and-distribution-mep-vancouver-wa.jpg

SunModo Warehouse Storage and Distribution

Vancouver, WA
SunModo’s 35,000 SF warehouse and office received complete MEP engineering by CEG, incorporating heat pump HVAC, EV charging, and rooftop solar to support growth and sustainability goals.
columbia-holdings-building-2-civil-structural-mep-fire-protection-bush-prairie-wa.jpg

Columbia Holdings Building #2

Brush Prairie, WA
A 20,000 SF pre-engineered metal building on a 1.3-acre site received full multidiscipline engineering covering civil, structural, MEP, and fire protection from entitlement through permitting, delivered by CEG.
modern-apartments-civil-portland-or.png

Modern Apartments

Portland, OR
CEG engineered all civil elements for a 30-unit, 3-story Oregon apartment complex on a third of an acre, including stormwater design, utility planning, right-of-way dedication, and ODOT coordination.
sutton-trucking-regional-distribution-hub-mep-cowlitz-county-wa.jpg

Sutton Trucking Regional Distribution Hub

Cowlitz County, WA
Complete MEP design for a 27,000 SF trucking hub, delivered by CEG, featuring VRF HVAC, energy recovery ventilation, infrared heaters, LED lighting controls, and full plumbing infrastructure.
gateway-substation-richland-wa-structural-engineering.jpg

Gateway Substation

Richland, WA
A new City of Richland electrical substation features modular A-frame, H-frame, and T-frame structures with full load analysis, connection detailing, and fabrication support, structurally engineered by CEG.
eastern-state-hospital-parking-lots-callbox-system-electrical-medical-lake-wa.jpg

Eastern State Hospital Parking Lots Callbox System

Medical Lake, WA
CEG designed fourteen solar-powered, cellular-connected emergency callbox towers across Eastern State Hospital, featuring automatic 911 escalation, two-way communication, and remote monitoring via web portal.
washington-state-police-ev-charging-infrastructure-electrical-marysville-wa.jpg

Washington State Police EV Charging Infrastructure

Marysville, WA
EV charging infrastructure at Washington State Patrol’s Marysville facility, integrated by CEG, includes four Level 2 chargers and one DC fast-charging station, supporting fleet expansion with full utility coordination.
nomad-subdivision-civil-washougal-wa

Nomad Subdivision

Washougal, WA
CEG developed a 1.9-acre site for a single-family residence and seven private lots, delivering road improvements, utility easements, and a low-maintenance stormwater system requiring no HOA oversight.
grace-slavic-baptist-church-civil-fire-protection-mep-structural-spokane-wa.jpg

Grace Slavic Baptist Church

Spokane, WA
A 38,000 SF worship and education facility, with CEG delivering fully integrated multidiscipline design covering all systems from sanctuary to commercial kitchen in a coordinated BIM environment.
3-lot-subdivision-civil-washougal-wa.jpg

3 Lot Subdivision

Washougal, WA
CEG handled all civil engineering for a Washougal residential short plat, covering grading, retaining walls, utility coordination, and permitting to deliver an efficient three-lot subdivision solution.
aurora-airport-hangar-civil-aurora-or.jpg

Aurora Airport Hangar

Aurora, OR
A 6.4-acre Aurora Airport aviation facility, with CEG providing full civil engineering including site grading, heavy-duty pavement, stormwater management, and utility coordination across two hangars with FAA and ODOT compliance.

Let's Build Your Next Project

Contact us to discuss how CEG can bring the same level of expertise and commitment

to your project.